Built on the Qognexus™ Framework

Your change programme has a readiness score. Do you know what it is?

Qognexus measures where your transformation stands, and tracks whether it is getting better or worse, before your go-live date becomes a crisis.

€1,500 flat, excluding VAT · 12 questions · about 15 minutes · one-off, no subscription, no certification, no Jira dependency

QOGNEXUSDesign stage

Readiness

3.4of 5

Approaching Ready

Complexity3.4 · High complexity
Responses312
PathTargeted Intervention

QPRS™ · groups at risk

  • 1Field salesCritical · Intent · Anchoring81
  • 2Customer serviceHigh · Need52
  • 3Regional managersModerate · Leadership38
  • 4MarketingLow · None24

Field sales scored below the 2.5 critical threshold on Intent. Resistance plan recommended.

Open QRT™

Example programme. Invented data, shown to illustrate the output.

Instruments you will not find anywhere else

  • QPRS™

    Programme Risk Score

    Ranks the groups most at risk of adoption failure and names the dimensions driving each score.

  • QRT™

    Resistance Typology

    Five resistance types, each with its own plan for the group showing it.

  • QVT™

    Velocity Tracker

    Week-over-week readiness velocity per group, with a trajectory and a confidence level.

  • QSM™

    Change Saturation Monitor

    Where change overload is building across every active programme, from measurements you already hold.

The gap no one is filling

Change management has a measurement problem.

Your portfolio tool tracks milestones. Your training platform tracks completions. Your digital adoption platform tracks clicks. None of them can tell you whether the people absorbing your transformation are ready, or whether what you are doing about it is working.

  • 01

    The readiness gap

    You’re measuring delivery progress, not people progress. Go-live looks green right up until adoption doesn’t.

  • 02

    The intervention gap

    You’re running workshops, comms and training. But you have no idea which ones are moving your scores.

  • 03

    The governance gap

    Your sponsor gets a status update once a month. By the time resistance shows up, it’s too late to course-correct.

Diagnose · Design · Assure

Six dimensions. One score. Tracked week by week.

The Qognexus™ Framework measures whether each impacted group understands the change, wants it, can do it, has capacity for it, is structurally supported, and has active leadership behind it. Every score is tracked over time, every intervention measured for effect.

  • Signal

    Do they understand the change?

  • Intent

    Do they want it?

  • Grounding

    Can they actually do it?

  • Need

    Do they have capacity for it?

  • Anchoring

    Is the structure behind them?

  • Leadership

    Is leadership actually leading it?

How Qognexus™ works
QOGNEXUS312 responses

Six dimensions · programme

Signal 3.7Intent 2.9Grounding 3.6Need 3.3Anchoring 3.1Leadership 3.9

1–5 scale · dashed ring = 3.5, Ready with Monitoring

Intent · by stakeholder group

  • Marketing3.6
  • Regional managers3.1
  • Customer service2.9
  • Field sales2.1

Intent is the weakest dimension

The programme average of 2.9 hides Field sales at 2.1. The average clears the critical threshold; the group does not.

Example programme. Invented data, shown to illustrate the output.

Two ways in

Start where you are.

  • Practitioners

    You deliver change to clients

    Consultants and boutique firms running programmes for other organisations. One licence, every client in its own isolated tenant, client-ready reports from the same evidence base. Priced on how many clients you carry, not per seat and not per client contract.

    • A separate, fully isolated tenant per client
    • The same Diagnose and Design instruments a Blueprint customer gets
    • Solo, Pro or Consultant: by client count, at 3, 6 or 15 clients
    See practitioner plans
  • Business

    You govern a portfolio

    Organisations running their own transformation. Full change blueprints, readiness scored across every impacted group, and continuous assurance once you are delivering.

    • Published prices and scope; every package but the portfolio tier checks out with a card
    • Sponsor and steering-group reporting
    • Ongoing assurance, not a one-off report
    See Business packages

Three stages, one system

From first diagnostic to sustained adoption.

See platform features
  1. Diagnose

    A programme-level readiness score, a complexity profile, the groups your change lands on, and a recommended intervention path, in about 15 minutes.

  2. Design

    Stakeholder impact, resistance classification, sponsor accountability and comms priority, all derived from your own diagnostic data rather than from templates.

  3. Assure

    Readiness velocity week by week, a trajectory for every group, and daily alerts when a group stalls or resistance turns acute.

Your transformation deserves better than a status update.

Know your readiness score, your complexity profile and your recommended next step, in about 15 minutes. No contract required.

Want to see the output first?

Tell us about your programme and we’ll walk you through a Qognexus™ report and what it would show for you.

Talk to us

Qognexus™ Quick Diagnostic
About 15 min · €1,500 flat

Run diagnostic